SONOFF SWV Zigbee Smart Water Valve IP55 Automatic Irrigation Easy Install Remote Control Time Schedule via eWeLink Alexa Google
SPECIFICATIONS
Battery Included: no
Brand Name: SONOFF
Casing materials: PC+ABS
Certification: CE
Color: Black
Communication method: Zigbee
Dimension: 152x100x46mm
Does It Includes Wireless Communication: Yes
High-concerned chemical: none
Inbox adaptor: No
Origin: Mainland China
Power Source: AC&DC,Ac
Rating: 6V(4*1.5V AA)
Thread Standard: BSP, NH
Watering temperature: 5°C~40°C
Waterproof: IP55
Wireless Communication: ZIGBEE
Wireless connection: Zigbee 3.0
Working humidity: 5%-95%RH, non-condensing
Working pressure: 0.06-0.8MPa
Working temperature: 5°C~60°C
SONOFF SWV Zigbee Smart Water Valve IP55 Automatic Irrigation Easy Install Remote Control Time Schedule via eWeLink Alexa Google
With SONOFF Zigbee Smart Water Valve, you can automate and control your watering system with ease. It is easy and quick to install, simply connect the Zigbee Smart Water Valve between the faucet and the hose to quickly upgrade your irrigation system in just three minutes, automatically watering your lawn, garden, vegetable patch, and more. Open the eWeLink app, tap the button, and you can start today's irrigation immediately. Set a smart scene for the Zigbee Smart Water Valve to irrigate automatically in the early morning, making your life easier.
The Zigbee Smart Water Valve features schedule and capacity modes, supporting single and cyclic irrigation. Say goodbye to forgotten watering and wasted water sessions, ensuring optimal hydration for your home plants or crops. Whether you're at home or away, our smart water valve provides the perfect amount of water, keeping your plants healthy and vibrant.
The Zigbee Smart Water Valve's battery can be used continuously for 20 months, covering two irrigation cycles(Once a day, for one hour each time). If there is a water shortage during irrigation, the app will immediately send a notification. Support checking up to 180 days of water usage and duration through the app. Understand daily, weekly, or monthly data to better control irrigation amounts and save more on water bills. You can use multiple Zigbee Smart Water Valves to work together, setting different irrigation modes for various areas of your home, and creating a personalized smart irrigation system.
SONOFF Zigbee Smart Water Valve is compatible with Zigbee hubs supporting Zigbee 3.0, including SONOFF iHost, SONOFF NSPanel Pro, ZB Bridge Pro, ZBDongle-P, ZBDongle-E, Echo Plus 2nd...
*NSPanel Pro and iHost will support Zigbee water valve in July.
The Zigbee Smart Water Valve supports voice control through Alexa and Google Home. A simple voice command can close the water valve when you think it's about to rain outside. The Zigbee Smart Water Valve can integrate into open-source platforms via ZBDongle-P or ZBDongle-E to perform automatic irrigation functions.
Let's discover the future of lawn care and plant watering with the SONOFF Zigbee smart water valve!

Easy Installation, Smart Irrigation
Simply connect the Zigbee Smart Water Valve between the faucet and the hose to quickly upgrade your irrigation system in just three minutes, automatically watering your lawn, garden, vegetable patch, and more.


Customize Suitable Irrigation Plans
The Zigbee Smart Water Valve features schedule mode and capacity mode, supporting both single and cyclic irrigation. Allow you to provide more targeted care for your home plants or crops.

Just a Touch to Irrigation
Busy with other tasks or traveling and unable to tend to your lawn in the morning? Open the eWeLink app, tap a button, and start today’s irrigation immediately.

Effortless Automation Timed Irrigation
Don’t want to wake up early to irrigate on weekends and just want to sleep in? Set a smart scene for the Zigbee Smart Water Valve to irrigate automatically in the early morning, making your life easier.

A Simple Voice to Control
Supports voice control through Alexa and Google Home. A simple voice command can close the water valve when you think it’s about to rain outside.

Peace of Mind from Every Way

Working Together for Smart Irrigation
You can use multiple Zigbee Smart Water Valves to work together, setting different irrigation modes for various areas of your home, and creating a personalized smart irrigation system.

Track Water Data for 180 Days
Support checking up to 180 days of water usage and duration through the app. Understand daily, weekly, or monthly data to better control irrigation amounts and save more on water bills.

Expand Capabilities on Open-Source Platforms
The Zigbee Smart Water Valve supports Zigbee 3.0. Integrate it into open-source platforms via ZBDongle-P or ZBDongle-E to perform automatic irrigation functions.


