Skip to product information
PVC Felt Cutter Digital Flatbed Box Cutting Plotter Corrugated Cardboard Cutting Machine Die Cut Machine for Paper Box
Sale price
€24.401,88
Regular price
€36.602,82
SPECIFICATIONS
Applicable Industries: Printing Shops,Advertising Company
Condition: New
Cutting Speed: 60-1200mm/s
Cutting Thickness: 30mm
Gross Weight: 1150KG
Material Fixed: Vacuum System
Normal Power: 7.5-11KW
Packaging Material: Paper
Packaging Type: Cartons,Film
Packing Size: 3450*2270*1400mm
Safety Device: Safe Anti-Collision System
Showroom Location: Vietnam,Thailand
Voltage: 380V,380V±10%
Warranty of core components: 1 Year
Working Range: 2500*1600mm
application: Machinery & Hardware
automatic grade: Automatic
brand name: DMAIS
core components: Motor
driven type: Mechanical
key selling points: High-Accuracy
machinery test report: Provided
place of origin: Guangdong, China
power: 11.5KW
type: Other
video outgoing-inspection: Provided
warranty: 1 Year
|
Products Description
Specification
Our Advantages
Recommend Products
Company Profile
![]() ![]() ![]() FAQ
1. Q: Are you the manufacturer or trading company?
A: We are the manufacturer specializing in laminator, and we independently R&D the siliconerollers. Therefore, we can provide the most competitive price for vou. 2. Q: How long is the warranty of the laminator?
A: The machine have free 12 months warranty from the date of arrival of goods (Except forconsumables), the seller give the damage part (non-human damage) for free, but the buverneed pay the freight fee. And if buyer need seller company arrange technician to buyer side, thebuyer need bear the fee, include the back and forth flight, accommodation. 3, Q: l am the dealer, can I OEM the machine if l purchase vour machines?
A: Yes, we can OEM for you, but the quantity you order must be large enough for us to customizethem. 4. Q: When can I get the quotation?
A: We usually quote within 24 hours after we get your inquiry. lf you are very urgent, pleasecall/email us so we will deal your inquiry priority. 5. Q: How long is the delivery time? A: We generally arrange production after receiving the deposit, it takes 7-15 days to finish theproducts and make shipment after receiving the balance.
|













